ISO/AWI 25124
Ships and marine technology — Offshore gangway system
Reference number
ISO/AWI 25124
Edición 1
Working draft
u
ISO/AWI 25124
89022
Un grupo de trabajo ha preparado un borrador.

Resumen

This document specifies the categories, designs, requirements and test methods of the offshore gangway system. The gangway includes all kinds of marine passages between ships, offshore installations and docks as follows: a) Ship to ship. b) Ship to offshore floating installation. c) Ship to dock. d) Ship to fixed offshore installation. e) Offshore floating installation to ship. This document is applicable to the gangway system for ships and offshore installations.

Informaciones generales

  •  : En desarrollo
    : Nuevo proyecto registrado en el programa de trabajo TC/SC [20.00]
  •  : 1
  • ISO/TC 8/SC 1
  • RSS actualizaciones

Got a question?

Check out our FAQs

Customer care
+41 22 749 08 88

Opening hours:
Monday to Friday - 09:00-12:00, 14:00-17:00 (UTC+1)