Abstract
This document specifies the drilling and blasting terms commonly used in mining. Only those terms that have a specific meaning in this field are included.
Life cycle
-
Now
-
00
Preliminary
-
10
Proposal
-
20
Preparatory
-
30
Committee
-
40
Enquiry
-
50
Approval
-
60
Publication
-
90
Review
-
95
Withdrawal
Amendments
Provide additional content; available for purchase; not included in the text of the existing standard.DeletedISO 22932-5:2023/WD Amd 1
-
00
-
Will be replaced by
Under developmentISO/DIS 22932-5