Draft
International Standard
ISO/DIS 24675-2
Railway Applications — Running time calculation for timetabling — Part 2: Distance-speed diagrams and speed curves
Reference number
ISO/DIS 24675-2
Edition 1
Projet Norme internationale
Preview
ISO/DIS 24675-2
85813
Indisponible en français
Projet de Norme internationale au stade enquête auprès des membres de l’ISO.

ISO/DIS 24675-2

ISO/DIS 24675-2
85813
Langue
Format
CHF 65
Convertir les francs suisses (CHF) dans une autre devise

Résumé

In order to create punctual timetables, it is necessary to accurately calculate and plan out running time between stopping or passing points, headway between trains, train scheduling, rolling stock scheduling, driver and crew scheduling, operation scheduling in stations and depots and line / infrastructure capacity.

Among these values, shortest running time between stopping or passing points must be calculated first, as this is the basis of timetabling.

This document describes a practical procedure to create and verify distance-speed diagrams and speed curves using the parameters specified in ISO 24675-1. Shortest running time is obtained by numerically integrating the speed curves.

This enables railway infrastructure managers, railway operators and related organizations to calculate accurate running time at the stage of setting up feasible and punctual daily timetables, seasonal timetables, annual timetables, strategic timetables for long-term perspective, and other timetables of a railway system.

This document excludes running time calculation used for purposes other than timetabling.

Informations générales

  •  : Projet

    Vous pouvez contribuer à l’élaboration de ce projet de Norme internationale en contactant le membre national

    : Mise au vote du DIS: 12 semaines [40.20]
  •  : 1
  • ISO/TC 269/SC 3
    45.020  03.220.30 
  • RSS mises à jour

Vous avez une question?

Consulter notre Aide et assistance